Engineering Document Intelligence
for Kuala Lumpur
Engineering document intelligence for Kuala Lumpur's PETRONAS ecosystem and Malaysian EPC hub. P&ID extraction for PETRONAS Carigali, RAPID Pengerang, and Malaysian EPC contractors. PETRONAS Technical Standards aligned, PDPA compliant, native multi-language extraction.
PETRONAS Carigali upstream documentation: P&ID extraction, instrument index, mill certificate traceability for offshore projects
RAPID Pengerang refining and petrochemical complex: handover documentation, asset register population, compliance automation
Kuala Lumpur EPC contractor support (KKB Engineering, MMC, Malakoff, TH Heavy Engineering, Sapura) project document automation
PETRONAS Technical Standards (PTS) compliant document extraction across all Malaysian PETRONAS-led projects
Cross-ASEAN project consolidation: Malaysian EPCs working on Indonesian, Brunei, and Thai projects with multi-format documentation
Malaysian Department of Occupational Safety and Health (DOSH) compliance documentation for boiler and pressure vessel registration
Does Pathnovo align with PETRONAS Technical Standards (PTS)?
Yes. Pathnovo's extraction models are configurable to PETRONAS Technical Standards numbering, naming conventions, and document classification used across PETRONAS-led upstream, downstream, and petrochemical projects. Output formats can be tuned per PTS deliverable templates for direct ingestion into PETRONAS document control systems.
Can Pathnovo support RAPID Pengerang and other major Malaysian projects?
Yes. RAPID Pengerang (Refinery and Petrochemical Integrated Development), one of the largest petrochemical complexes globally, is exactly the kind of mega-project Pathnovo is built for: tens of thousands of P&IDs across multiple EPC contractors, complex compliance requirements, multi-year handover programmes. Pathnovo extracts and consolidates engineering data across vendor variations into a unified asset register.
Is Pathnovo compliant with Malaysia's PDPA?
Yes. Pathnovo's data handling is aligned to Malaysia's Personal Data Protection Act 2010. Engineering documents do not typically contain personal data, but project metadata is handled per PDPA consent and notification requirements. Data residency configurable to AWS Singapore or Azure Southeast Asia regions for Malaysian project data localisation.
What is Pathnovo pricing for Kuala Lumpur and Malaysian engagements?
Per-drawing from $95 on Project tier, $65 on Enterprise volume. Per-deliverable Managed Service from $300 (mill cert traceability) to $12,000 (piping MTO per revision set). Free 10-document pilot. PETRONAS rate-card compatibility available for direct PETRONAS Carigali / PETRONAS Refining engagements. See /pricing for full matrix.
See what your documents actually contain.
Send us 10 documents from your current project. We extract, reconcile, and show you exactly what we find in 48 hours, before any contract.
If the accuracy isn't what we promised, you owe us nothing.
