India's only dedicated OISD 118 compliance software. Digitize HAZOP registers, map actions to P&ID revisions, and generate audit-ready compliance documentation — in weeks, not months.
800-3,000 page HAZOP studies structured into queryable registers. Every action item extracted with cause, consequence, safeguard, and recommendation.
HAZOP actions mapped to current P&ID revision nodes. When P&IDs are revised, action references are automatically updated.
Actions categorized by risk: critical, high, medium, low. Priority based on consequence severity and likelihood ratings from the HAZOP study.
Output structured in OISD 118-compliant format. Ready for OISD regulatory audit submissions and petroleum ministry reviews.
Digitize legacy HAZOP studies for OISD 118 periodic review compliance
Map HAZOP actions to current P&ID revisions for ongoing validity
Generate OISD 118 compliance registers for petroleum ministry audits
Track HAZOP action closure status across plant lifecycle
Prepare for OISD 118 mandatory periodic HAZOP reviews
Structure HAZOP data for integration with plant safety management systems
OISD 118 mandates periodic HAZOP studies and action tracking for all petroleum installations in India. Non-compliance can result in regulatory shutdowns, insurance invalidation, and personal liability for plant managers. The standard requires HAZOP actions to be tracked to closure with evidence that recommendations are implemented. Pathnovo structures this documentation automatically from HAZOP study PDFs.
Pathnovo extracts every action item from HAZOP study documents, maps each action to the relevant P&ID node and current revision, classifies by priority, and generates a structured register in OISD 118-compliant format. When P&IDs are revised, action references are updated automatically. This replaces 3-6 months of manual work with 2-4 weeks of automated processing.
OISD 118 (Oil Industry Safety Directorate Standard 118) mandates HAZOP (Hazard and Operability) studies for petroleum installations in India. It requires periodic review and update of HAZOP studies, with action item tracking and closure verification. Compliance is mandatory for all refineries, petrochemical plants, and petroleum storage facilities under OISD jurisdiction.
Pathnovo digitizes HAZOP study registers from any format (PDF, Word, Excel), maps actions to current P&ID revisions, categorizes actions by priority, and generates audit-ready registers in OISD 118-compliant format. This replaces months of manual register compilation with automated, accurate processing.
Yes. We process HAZOP studies in any format from any consultancy — legacy scanned PDFs, structured Word documents, Excel files, and database exports. Our models handle variations in HAZOP format, terminology, and structure.
For a typical HAZOP study of 800-3,000 pages, digitization takes 2-4 weeks including extraction, P&ID mapping, priority classification, and quality review. This compares to 3-6 months for manual processing.
Node reference, deviation, cause, consequence, existing safeguards, recommendations, action items, responsible party, due date, priority, P&ID reference, and SIL classification where applicable.
Send us 10 documents from your current project. We extract, reconcile, and show you exactly what we find in 48 hours, before any contract.
If the accuracy isn't what we promised, you owe us nothing.
Connect with Pathnovo to discuss your engineering document intelligence needs.
Email: hello@pathnovo.com
Send us a message, and we'll get back to you shortly.
You can also stay connected through our official social media channels.
Our Offices
Bangalore Office
Unit 101, OXFORD TOWERS 139, Old HAL Airport Rd, Kodihalli, Bengaluru, Karnataka 560008