Pathnovo Logo

IBR Compliance Software for India

Automated inspection registers, due date tracking, and certificate management for Indian Boiler Regulations. Never miss an IBR inspection deadline again.

01

Form III and Form IV Register Automation

The only software that auto-populates IBR Form III (manufacturer) and Form IV (user) registers from equipment datasheets, mill certificates, and inspection reports. Every boiler, pressure vessel, economiser, superheater, and IBR-scoped piping item registered, classified, and tracked automatically.

02

Mill Certificate to Pressure Part Matching

Every IBR-scoped pressure part matched to its mill certificate (MTR), with chemistry and mechanical properties validated against IBR-approved material lists. Missing certificates, non-approved materials, and traceability gaps flagged before Chief Inspector review.

03

Due Date Tracking and Alerts

IBR periodic inspection due dates tracked across every registered boiler and pressure vessel. Hydrotest, internal inspection, external inspection, and renewal dates monitored with automated alerts 90 / 60 / 30 days before due. No missed deadlines, no equipment shutdown orders.

04

Certificate and Stamping Tracking

IBR Form II, Form III, Form IV, welder qualification (Form VIII), WPS and PQR (Forms IX–XII) tracked with validity, renewal dates, inspector details, and Chief Inspector stamping status. Electronic evidence repository linked to the inspection register.

05

Chief Inspector Audit Package

One-click generation of the complete audit package: equipment register, material traceability, inspection history, welding records, hydrotest certificates, remediation evidence. Formatted per the inspection protocol of every Indian state's Directorate of Steam Boilers.

06

State-Specific Format Support

Maharashtra, Gujarat, Tamil Nadu, Andhra Pradesh, Karnataka, West Bengal, Odisha, Rajasthan: every state Boiler Inspectorate has its own form format. Pathnovo auto-generates registers in the required state format.

07

Legacy Record Digitisation

Handwritten log books, scanned Form IV registers, decades-old Chief Inspector correspondence: all digitised and structured into the live register. Brownfield refinery turnarounds and legacy plant revamps become IBR-compliant within weeks, not years.

08

HAZOP and OISD-118 Cross-Reference

IBR equipment cross-referenced with HAZOP action register and OISD-118 compliance where applicable. Safety-critical pressure parts flagged for integrated audit readiness across all three Indian regulatory regimes.

Auto-populate IBR Form IV register for 500+ pressure vessels in a refinery turnaround ahead of Chief Inspector visit

Match 180,000+ mill certificates to pressure parts with full IBR chemistry / mechanical property validation

Track IBR hydrotest due dates across an EPC project with 2,000+ IBR-scoped items

Digitise 40 years of handwritten Form IV log books at an IOCL / BPCL / HPCL refinery into a searchable register

Generate Chief Inspector audit package for a new boiler commissioning (Form VI completion)

Detect non-IBR-approved material specifications during procurement QA before field installation

Prepare IBR renewal documentation for all boilers at a petrochemical complex annually

Cross-reference IBR register with HAZOP actions for integrated HSE audit preparation

Validate welder qualifications (Form VIII) against each IBR weld joint per ASME IX / IBR-accepted WPS

Consolidate multi-unit IBR registers across a complex into a single directorate submission

Why is IBR compliance automation important for Indian industrial facilities?

IBR compliance is legally mandatory and non-negotiable. Missing a periodic inspection deadline results in immediate equipment shutdown orders from the state Directorate of Steam Boilers; a single boiler shutdown at an operating refinery costs $120,000-600,000 per day in lost production. Insurance invalidation follows. Chief Inspector escalation can trigger unit-level shutdown orders. Manual tracking in spreadsheets fails at scale; facilities with 500–5,000 IBR items lose due dates, lose certificates, lose material traceability evidence. Pathnovo automates the entire register lifecycle with Form III / Form IV maintenance, due date tracking, material traceability, audit preparation, and state-format generation. This is not a nice-to-have; for Indian process industries it is core operating infrastructure.

How is Pathnovo's IBR compliance service different from other compliance tools?

No other software product automates IBR compliance. Accredited inspection agencies (TÜV SÜD India, IRS, Bureau Veritas) perform the inspection itself but do not maintain the client's register. Generic compliance platforms (Cority, Intelex, Sphera, Enablon) do not know about IBR 1950, Form III / Form IV, state-specific formats, IBR-approved material lists, welder qualification categories per IBR, or Chief Inspector stamping protocols. Indian engineering consultancies offer manual IBR register services but not automated software. Pathnovo is the only vendor globally providing software-automated IBR compliance with full state coverage.

What does an IBR compliance register look like when automated by Pathnovo?

The register has one row per IBR-scoped item with columns for: equipment tag, equipment type (boiler / PV / economiser / piping), design code (IBR / ASME Section I / ASME Section VIII Div 1), design pressure and temperature, material specification (IBR-approved grade), Form III reference (manufacturer's certificate), Form IV reference (user's register entry), hydrotest date and certificate, internal inspection date and certificate, external inspection date and certificate, next due date for each inspection, welder qualification reference, WPS / PQR reference, state Directorate submission log, remediation action log, and link to source documents for each field. The register is queryable, filterable by due date, and exportable in each state's required format.

Can Pathnovo help an EPC contractor hand over an IBR-compliant plant on Day 1?

Yes, this is the headline use case for EPC contractors. During EPC, all IBR-scoped equipment is sourced with mill certificates, welded with qualified WPS, hydrotested, and inspected. Historically the resulting documentation is a mess at handover: certificates in multiple formats, welder records in Excel, inspection reports in scanned PDF, Form III and Form IV in paper files. Pathnovo structures all of this into a live register that the owner-operator receives on Day 1 of handover. The first annual renewal happens from the Pathnovo register, not from reconstructing paper files. McDermott-style EPC handovers with full IBR register are now possible in 48 hours instead of 6 months.

How does Pathnovo's IBR automation integrate with the Chief Inspector of Boilers?

Chief Inspector visits remain manual: an inspector is physically present on-site, examines equipment, reviews documentation, stamps Form VI / Form XIV. Pathnovo prepares the documentation that the Chief Inspector reviews. The register, material traceability, welder qualification matrix, WPS / PQR, hydrotest certificates, previous inspection records, and remediation evidence are all presented in the state's required format. Chief Inspector desk-review time on a typical refinery annual audit drops from 3–5 days to 3–5 hours, enabling more plants to be covered per inspector year.

What are the Indian Boiler Regulations (IBR) 1950?

IBR 1950 is the Indian statutory regulation governing design, manufacture, construction, erection, operation, inspection, and repair of boilers and pressure vessels. Compliance is mandatory for any installation containing steam at pressure above 1 bar with capacity > 25 litres. The regulation is administered by state Directorates of Steam Boilers under the Chief Inspector of Boilers. Every IBR-scoped item must carry valid Form III (manufacturer's certificate) and Form IV (user's register) documentation, must be inspected periodically (typically annually for internal inspection, biennially for hydrotest), and must be renewed before certificate expiry.

How does Pathnovo help with IBR compliance?

Pathnovo is the only end-to-end IBR compliance automation platform. It (1) auto-populates Form III and Form IV registers from equipment datasheets and mill certificates, (2) matches every pressure part to its MTR with chemistry and mechanical property validation against IBR-approved materials, (3) tracks periodic inspection due dates with automated alerts, (4) manages welder qualification, WPS, PQR, and stamping records, (5) generates Chief Inspector audit packages in each state's required format, and (6) digitises legacy inspection records for brownfield plants. What was a 60–120 day manual process becomes a continuous, real-time register.

Is Pathnovo an accredited IBR inspection agency?

No. Accredited IBR inspection is performed by authorities like TÜV SÜD India, IRS, Bureau Veritas, Lloyd's Register, and state-appointed inspectors. Pathnovo does not replace the inspector; it automates the documentation, register maintenance, material traceability, and audit-preparation workflow that surrounds the inspection. Accredited inspectors typically welcome Pathnovo-generated registers because they cut inspection-day desk time by 70%+.

Can you digitise legacy inspection records and handwritten log books?

Yes. This is one of the most common engagements. A typical Indian PSU refinery has 30–50 years of handwritten Form IV log books, scanned Chief Inspector correspondence, typed reports, Excel registers maintained by successive plant engineers, and vendor MTRs in varying formats. Pathnovo digitises and structures all of it into a single live register with equipment linkage, preserving the original document as audit evidence linked from the register row.

Which Indian states' formats are supported?

All 29 states and 7 union territories. Every state Directorate of Steam Boilers has its own Form IV format, its own inspection schedule, and its own renewal cadence. Maharashtra, Gujarat, Tamil Nadu, Andhra Pradesh, Karnataka, West Bengal, Odisha, Rajasthan, Kerala, Telangana, Haryana, Punjab, Uttar Pradesh, and Madhya Pradesh are pre-configured. Other states are configured on first engagement.

How does IBR register integrate with mill certificate traceability?

Tightly. Every IBR-scoped pressure part is linked to the specific mill certificate that certifies its material. Pathnovo extracts mill certificate data (see /solutions/procurement-intelligence/mill-certificate), cross-checks chemistry and mechanical properties against the IBR-approved material list, validates the mill's own IBR-certification (mills supplying IBR material must be IBR-certified themselves), and flags any deviation. The two workflows run as one integrated compliance engine.

What equipment is IBR-scoped?

Steam boilers above 1 bar / 25 L, economisers, superheaters, steam piping at IBR thresholds, steam drums, mud drums, boiler feed water piping, safety valves on IBR equipment, and any pressure-containing ancillary item per IBR classification tables. Indian oil refineries, petrochemical plants, fertiliser plants, power stations, and process industries routinely carry 500–5,000 IBR-scoped items per complex.

How long does typical IBR audit preparation take with Pathnovo?

Manual preparation for a Chief Inspector annual review at a refinery takes 6–12 weeks across the QA, inspection, and materials teams. With Pathnovo's live register, audit preparation becomes a one-click export: the register is already current, material traceability is already validated, due dates are already tracked, remediation evidence is already linked. Audit-day desk reviews that used to run 3–5 days typically complete in hours.

What happens when IBR equipment changes material or design during revamp?

During a revamp (MoC, or Management of Change) some IBR equipment is re-plated (new design registration), some is re-rated (operating conditions change), some is replaced. Each case needs new documentation submitted to the state Directorate. Pathnovo maintains an MoC log tied to each IBR item, generates the required fresh Form III / Form VI submissions, and tracks Chief Inspector approval.

Does this work with SAP, Maximo, or existing plant asset systems?

Yes. Pathnovo's IBR register integrates with SAP PM, IBM Maximo, AVEVA NET, and any EAM / CMMS. Equipment master data flows both ways: new IBR equipment added in SAP automatically appears in the Pathnovo register, inspection findings from Pathnovo update the SAP notification log. Custom integrations configured per client.

What does pricing look like for IBR compliance automation?

IBR Form IV register automation, Chief Inspector audit preparation, and material traceability to IBR-approved mills are included on the Scale tier (25,000+ credits/month) and Enterprise. Single-facility programmes typically fit inside one Scale month; multi-site portfolios sit on Enterprise on 3-year contracts with bulk historical data-room ingestion sized per facility count. Indian PSU rate-card compatibility available. See our pricing page for full plan details.

IBR 1950 Subject-Matter Expert

Senior EPC & HAZOP Advisor

Pathnovo Domain Advisor, EPC Engineering & Project Management · 26+ years O&G EPC

Reviews and signs off Pathnovo's IBR Form III / Form IV register output, mill certificate to pressure part matching logic, and Chief Inspector audit-package format. Past life: Shell-certified HAZOP facilitator on multiple refinery and petrochemical mega-projects across South Asia and the Gulf.

  • ·IIT Kanpur MTech, Process Engineering
  • ·Shell-certified HAZOP facilitator (IEC 61882)
  • ·26+ years O&G EPC experience across India and Gulf
  • ·ASME / API standards committee participation
  • ·Former Lead Engineer on multiple IBR-scoped refinery projects

Pathnovo's IBR 1950 workflow is reviewed and signed off by named domain experts. Every compliance deliverable carries an SME-verified audit trail.

See what your documents actually contain.

Send us 10 documents from your current project. We extract, reconcile, and show you exactly what we find in 48 hours, before any contract.

If the accuracy isn't what we promised, you owe us nothing.