The only managed service globally that matches mill test reports (MTRs) to EPC purchase order line items at scale. Pathnovo extracts every parameter from any MTR format, EN 10204 3.1 / 3.2, ASME, JIS, GB, IS, links to PO line items by heat number and material grade, and produces gap reports before site inspectors arrive. 180,000+ certificate formats handled. IBR + ASME + NACE + EN 10204 compliant. 48-hour managed service.
Trained on a corpus of 180,000+ mill test reports from steel mills, fitting manufacturers, valve OEMs, flange forges, and bolt suppliers worldwide. EN 10204 3.1 and 3.2, ASME SA / SB material certifications, JIS, GB, IS, and proprietary mill formats handled without template configuration.
The only product that links MTRs to specific EPC PO line items by heat number, material grade, dimension, and quantity. Mismatches surfaced before inspector arrival. Foundation of the IBR Form IV register and PESO compliance backbone.
Every batch returns a gap report: which PO line items lack a valid mill cert, which mill certs cover items not on any PO, and which certs have spec deviations. Site inspectors arrive with a clean register, not a paper search.
Output validates each MTR against project material spec (ASME SA-106 Gr B, SA-105, A-358, A-312, A-790, etc.), Indian Boiler Regulations IBR Form IV chemistry / mechanical requirements, NACE MR-0175 sour service requirements, and EN 10204 3.1 / 3.2 inspection levels. Non-conformance flagged automatically.
Submit mill certs in any format, receive structured register with PO matches and gap report within 48 business hours. Volume tier scales to 50,000+ certificates per project. Indian PSU rate-card compatibility available.
Mill certs in English, Mandarin, Korean, Japanese, German, French, Russian, Hindi, Arabic processed natively. Hand-stamped legacy certs from the 1980s onward, photographed certs, and faded carbon copies all handled.
Heat numbers, batch numbers, charge analysis IDs, and lot numbers extracted with full chain-of-custody traceability. Every quantity on every cert linked to its source heat.
Each chemical element (C, Mn, Si, P, S, Cr, Ni, Mo, V, Nb, Cu, etc.) extracted and cross-checked against material spec ranges. Non-conformance flagged with exact deviation. NACE MR-0175 sour service requirements (e.g. max hardness, max sulphide content) validated.
Yield strength, tensile strength, elongation, hardness, impact toughness (Charpy V-notch), bend test results extracted and validated. IBR mechanical requirements for boiler-grade steels (SA-106, SA-516, P-91, P-22) cross-checked.
Each cert linked to PO line items by heat / lot / batch / dimension / grade. Quantity matching: did cert quantity cover PO line quantity? Tag-level traceability maintained from cert to installed asset position.
Three-way gap report: missing certs (PO lines without certs), orphan certs (certs without matching POs), spec deviations (certs that fail material spec). Output is inspector-ready and audit-defensible.
For Indian boiler / pressure-equipment scope, the cert register auto-populates IBR Form IV (material identification record) with chemistry, mechanical properties, heat number, and Chief Inspector of Boilers approval status. Complete IBR compliance backbone in one workflow.
EPC contractor receiving 180,000+ mill certs per project: structured register with PO matches in 48 hours
Indian PSU refinery turnaround: IBR Form IV register built from accumulated mill certs across 10 years of capital projects
Pre-inspection gap report: mill cert register cleaned and audit-defensible before TÜV / Lloyd's / DNV inspector arrives
Material reconciliation: detect over-shipment, under-shipment, and spec deviations across multi-vendor procurement
Sour service NACE MR-0175 validation: hardness and chemistry compliance flagged automatically
Construction QA: every weld joint linked to its mill cert through line list and isometric pipe spec
Insurance / valuation audits: complete material provenance for any plant asset
Forensic investigation: trace material failure (e.g. piping rupture) back to specific heat, mill, and PO line
EN 10204 is the European standard for material certificates. 3.1 is a mill certificate issued by the manufacturer's quality department, validated by an authorised representative independent of production. 3.2 adds a third-party inspection (e.g. by TÜV, Lloyd's, DNV) and is required for safety-critical applications, IBR-scoped pressure equipment, and most O&G EPC procurement above defined size / pressure thresholds. Pathnovo extracts and validates both, flags 3.1 used where 3.2 is required, and tracks third-party inspector identity per cert.
Every PO line item carries a tag, a material grade, a size, and an order quantity. Every mill cert carries heat number, material grade, size, and shipped quantity. Pathnovo cross-references heat to PO using a multi-attribute match (grade + size + quantity + delivery date). Where heat is not on the PO line directly, the upstream supplier shipping document (mill packing list, bill of lading) bridges the gap. Output: every PO line item linked to one or more heat numbers with quantity rollup, and every cert linked to the PO line(s) it supplies.
A heat number is the unique identifier of a single batch of molten steel poured into a casting or forging. Every plate, pipe, fitting, and bar from that heat shares the same chemistry and mechanical properties certified once on a single mill cert. Heat traceability matters because regulatory codes (ASME, IBR, PED, NACE) require provenance from heat to installed component. Without heat traceability, no IBR registration, no PESO certification, no safety case for sour service, no forensic investigation. The pressure-equipment industry runs on heat numbers; without a structured register, every project is exposed.
Yes for any IBR-scoped pressure equipment in India (boilers, pressure vessels, piping above IBR thresholds). Yes for ASME Boiler & Pressure Vessel Code-stamped equipment globally. Yes for PED (European pressure equipment directive) Category I and above. Yes for NACE MR-0175 sour service applications in the petrochemical and oil & gas industries. Yes for any project with EN 10204 3.2 specified procurement requirements. The mill cert register is also typically a contractual handover deliverable from EPC to owner-operator. Pathnovo automates the workflow that is otherwise done manually in spreadsheets.
GoSmarter and Certivo serve metals manufacturers and distributors: they extract mill certs at the producer side. They do not handle EPC PO matching, IBR Form IV registers, PESO compliance, or multi-vendor reconciliation. Pathnovo is built for the EPC + owner-operator side: matching incoming mill certs to issued POs, generating gap reports before inspection, and producing the regulatory views that Indian and ASME-scope projects require. Different industry, different output, different workflow.
Pathnovo handles them natively. The training corpus includes mill certs from Chinese steel mills (Baowu, Ansteel, HBIS), Korean producers (POSCO, Hyundai, Seah), Japanese mills (Nippon Steel, JFE, Kobe Steel), Indian (SAIL, Tata, JSW, Jindal), German (TKS, Salzgitter), French (Vallourec), Russian (TMK, ChelPipe), and Middle Eastern producers. Translation is automatic; ASTM / EN / JIS / GB / IS material grade equivalences are built in. Output is in English with original-language source citations.
Mill certificate processing is included on every paid tier of the credit-based pricing model. Each certificate page consumes 2 credits, so a typical 100-200 certificate batch fits comfortably inside Starter (₹40,000/$1,200 per month, 1,000 credits). Larger batches (5,000+ certs) sit on Professional or Scale. Indian PSU rate-card compatibility available. Free 14-day trial with 100 credits to validate up to 50 certs before any commitment. Full pricing detail at /pricing.
IBR Form IV is the material identification record required for every IBR-registered pressure-equipment item in India. It captures heat number, chemistry, mechanical properties, and certification chain. Pathnovo extracts every IBR-scoped cert, validates against IBR chemistry / mechanical requirements, and auto-populates Form IV per item. The output integrates with /compliance/ibr for IBR registration, IBR welder qualification (Form VIII), and Chief Inspector of Boilers stamping workflows.
Pricing
Credit-based, full platform included on every paid tier. 2 credits per certificate page. Starter from ₹40,000/$1,200 per month for 1,000 credits.
Learn more
Pillar
The umbrella pillar covering MR → BOM → TBE → PO → MTR. Mill cert traceability is the back-end of this chain.
Learn more
Cluster
Earlier cluster page for the same workflow with deeper procurement-intelligence integration narrative.
Learn more
Cluster
The procurement-intelligence cluster page focused on mill certs from a buyer-workflow perspective.
Learn more
Compliance
Mill cert register doubles as the IBR Form IV input. Boiler / pressure-equipment compliance backbone.
Learn more
Compliance
IBR + OISD 118 + PESO + CCOE bundled compliance from one extraction project.
Learn more
Compliance
Hazardous-area material certifications (Form XIV / XV) auto-populated from cert register.
Learn more
Pillar
Mill cert traceability feeds the equipment master with material provenance for every asset.
Learn more
Alternative
GoSmarter serves metals manufacturers. Pathnovo serves EPC + owner-operator with PO matching and IBR / PESO output.
Learn more
Comparison
Pathnovo vs GoSmarter vs Certivo vs in-house spreadsheets: feature, scope, and pricing comparison.
Learn more
Integration
Feed mill cert register + PO match into Indian EPC's #1 EDMS for complete document control.
Learn more
Integration
Mill certs arrive via vendor documentation workflows. Pathnovo + DocBoss covers the full vendor doc → cert register chain.
Learn more
Region
L&T Hydrocarbon, Tata Projects, Petrofac India, Worley Mumbai mill cert volumes.
Learn more
Region
Aramco-spec procurement with EN 10204 3.2 mandatory inspection requirements.
Learn more
Industry
Refinery turnaround mill cert backlog clearance and IBR registration for pressure equipment.
Learn more
Industry
NACE MR-0175 sour service material compliance for petrochem expansions.
Learn more
Three reasons. First, scale: a major refinery revamp generates 50,000-180,000 mill certs from 100+ vendors. Second, format diversity: every steel mill, fitting manufacturer, valve OEM, and bolt supplier issues mill certs in their own format, often hand-stamped, in their own language, with their own heat numbering convention. Third, regulatory consequence: missing or non-compliant certs mean no IBR registration, no PESO clearance, no plant commissioning. The work is currently done manually in Excel spreadsheets across QA, procurement, and document control teams. Per-cert manual review takes 30-90 minutes; multiplied across a project, the cost is staggering. Pathnovo extracts and matches at 2 credits per certificate page with structured output and IBR-compliant gap reports, drawing from your monthly tier allocation rather than a per-cert charge. ROI is measured in days, not quarters.
Mill cert traceability is the back-end of the EPC procurement chain. Upstream: P&ID extraction → instrument / equipment / line list → MR (material requisition) package → BOM → TBE (technical bid evaluation) → PO issued. Downstream: vendor ships material with mill certs → Pathnovo extracts and matches certs to PO line items → IBR / PESO / ASME registers populated → site QA accepts material → installation → handover to owner-operator with full provenance register. Pathnovo offers every layer of this chain as a managed service. See /solutions/procurement-intelligence for the full chain.
Indian PSU refineries (IOCL, BPCL, HPCL, ONGC, GAIL) and Indian PSU EPCs (L&T Hydrocarbon, Tata Projects, Petrofac India, Toyo Engineering India) where IBR + PESO + CCOE compliance is mandatory. Gulf NOCs (Aramco, ADNOC, KOC, Petronas, QatarEnergy) where ASME-stamped pressure equipment provenance is contractual. Global EPCs (McDermott, Wood, Worley, Saipem) executing pressure-equipment-heavy projects. Owner-operators of brownfield plants needing retrospective registers for legacy equipment. Target project size: $60M to $6B capex.
Manual review: 30-90 minutes per cert × 50,000 certs × ₹3,000/hour senior QA engineer rate = ₹75 lakh to ₹2.25 crore per project just for cert review, ignoring rework when missing items surface at site inspection. Pathnovo runs the same workload on the credit-based tier model: 50,000 certs at 2 credits/page sits comfortably on Scale (from ₹6,50,000/$20,000 per month, 25,000 credits) or Enterprise with bulk data-room ingestion sized per certificate count, an order of magnitude lower than manual cost. The hidden saving is rework prevention: at one Indian refinery, an undetected mill cert gap on 87 line items triggered a 6-week site work stoppage when the IBR inspector arrived. Pathnovo's gap report would have caught it 6 weeks earlier with a rework cost of zero.
The 180,000 figure refers to the format corpus our models have seen, not 180,000 distinct templates. Mill certs share a finite vocabulary: heat number, grade, dimension, chemistry table, mechanical properties table, certification stamp, third-party inspector signature. The variation is in layout, language, abbreviation conventions, and stamp formats. Our extraction engine works at the semantic layer (find chemistry table, identify columns, map to ASTM elements) rather than the visual layer (template matching), so it generalises to new formats without retraining. New formats encountered in production are added to the corpus continuously, so accuracy improves with every project.
Send us 10 documents from your current project. We extract, reconcile, and show you exactly what we find in 48 hours, before any contract.
If the accuracy isn't what we promised, you owe us nothing.
Connect with Pathnovo to discuss your engineering document intelligence needs.
Email: hello@pathnovo.com
Send us a message, and we'll get back to you shortly.
You can also stay connected through our official social media channels.
Our Offices
Bangalore Office
Unit 101, OXFORD TOWERS 139, Old HAL Airport Rd, Kodihalli, Bengaluru, Karnataka 560008